Improving flow in large infrastructure projects

image

Large infrastructure projects have a dubious record – rarely is a project delivered on or before the original planned due date. Analysis of every failed project reveals that the delays are due to uncertainties; apparently, outside the direct locus of control of managers.

Is it really the case? Are we sure that there are no wastages that are created due to dysfunctional management practices?

The wastage of time and capacity in projects emanates from the following erroneous paradigms of management:

Assumption of (In) Adequate Resources

Most of the large infrastructure projects are actually many independent sub-projects, almost executed in parallel with integration at the end. The managerial and technical bandwidth, and even the direct resources (civil labor, fabricators, engineers, etc.) required to manage it are significant. But, in most cases, there is always a scarcity of resources. But at the same time, to complete a project on time, it is considered imperative to work on all work fronts sooner rather than later. This in turn leads to bad multi-tasking in engineering and procurement. Delays creep in and almost every sub-project is delayed in the pre-erection phase. Civil work invariably starts without complete drawings, leading to further interruptions. At the same time, when many civil work fronts are started simultaneously, progress slows down due to the thin assignment of resources.

 

Almost every manager, in every key area, attributes delays to “inadequate resourcing” and all efforts go in recruiting experienced or skilled resources, which seem ever elusive. However, what gets ignored is the rampant wastage of limited resources due to multitasking in various support departments leading to inadequate preparations before the start of site job or poor issue resolution due to stretched management bandwidth.

Conflict of cost and time

Large projects invariably involve huge procurement budgets with significant scope for negotiations for a price reduction. Typically, the use of multiple vendors and aggregation of various parts in different modules (or sub-projects) are considered as the best way to reduce the costs of bought outs. But at the same time, such aggregations also create a “batching effect” in design and procurement. This leads to a situation where work has to be done in parallel on all sub-projects at the site. In the end, one reaches a stage where commissioning not only has to be done independently for each sub-project, but also for the larger integration between sub-projects for going live on entire operations. This invariably leads to rework and cascading delays.

 

Management by milestones

In such projects, it is considered that task detailing and scheduling is good for the overall project. Scheduling of minor tasks is usually done up to level 4 and even level 5. This level of detailing in task scheduling leads to buffering, and higher overall lead time. When the task milestones are converted to a deadline, it invariably leads to behaviour of adding buffers in plans while most of it is wasted in execution. Surprises are revealed only close to milestones when delays are not recoverable. Issue resolution slows down and blame games become rampant and plans are rescheduled to follow the execution. Execution drives plans rather than the other way out.

 

The way out

The ‘Theory of Constraints way of managing large projects is to first acknowledge the limitations in resourcing and management bandwidth. Once this limitation is accepted, the focus shifts to exploiting the limited bandwidth rather than wasting it by bad multitasking. So, the way ahead is to visualize the large project as a portfolio of small subprojects and stagger them considering the limitation in resources. The rules of WIP (work in progress) control are put in design/procurement with clear prioritization of different modules. Work on a module is activated not based on a planned start date but based on a module completed from allowed WIP. The staggering of work fronts in pre-erection leads to staggered execution in civil.

 

The conflict of cost and time is resolved by organizing work for collective simultaneous decision-making. The procurement contracts are designed to get aggregation benefits without having to aggregate and batch work modules.

Similarly, daily management becomes the guiding management mantra rather than milestone management. The buffers are shifted from the tasks and aggregated at the project level to provide maximum safety at a point where it is needed the most.

Talk to Us

Improving flow in large infrastructure projects

Industry Insights

dbr
Engineering & Construction

Caught in a time wrap!

Large construction and erection projects seem to have a dubious record – most of them are delayed with significant cost overruns.

user-img
Satyashri Mohanty
dbr
Engineering & Construction

Getting CCPM implementation right

Cherry-picking solution components and sequencing them incorrectly can lead to the failure of CCPM implementations

user-img
Satyashri Mohanty
dbr
Engineering & Construction

EPC reborn focus on flow

Find out how to deliver EPC projects on time even in an environment of high uncertainty

user-img
Satyashri Mohanty

Get in touch

Registered Office:
Vector Management Consulting Pvt. Ltd.
10th floor, Thane One, DIL Complex,
Ghodbunder Road, Majiwada,
Thane (West), Maharashtra - 400610, India.
Phone:
022 6230 8800, 022 6230 8801

Corporate Identity Number:
U74140MH2006PTC164922
For any queries, contact:
Mr. Hemal Bhuptani
[email protected]